Totaling over 55,000’ of fabricated pipe, this ground up project was for a local paper-mill and completed over an 11 month period. Our BIM Team was an integral part to this process keeping the fabrication on track.
The project included pre-fabrication and installation of Natural Gas systems throughout the plant for both process and HVAC along with the fabrication and installation of the wet-end process piping.
Our talented team also designed and pre-fabricated two 70′ long 30″ round sections of stainless steel pipe, that were transported to the location and lowered down into place early in the build process, allowing the rest of the project to continue.
Fabrication and installation of thousands of pipe supports. 95% of these were specialty fabricated in our custom metal shop.
It was estimated that our Protem CTA 14″- 30″ saved us over 70% in labour, being able to cut and bevel both sides of the pipe at the same time.